How Long a Design Project and Renovation Take: Realistic Timelines

A design project for a 60–100 m² apartment takes roughly 8–12 weeks; an architectural design for a house starts from a month. The renovation itself takes longer and depends on the scope. Here are the timelines stage by stage, so you can plan realistically.

Design project timelines

A project for a 60–100 m² apartment is roughly 8–12 weeks of work: layout planning, visualizations, working drawings and specifications. An architectural design for a house takes from 1 month, depending on the size and complexity.

Why the project should not be rushed

Every decision is made at the design stage. A few weeks spent here save months of rework during the renovation. Changing the layout on paper is free; rebuilding a wall that has already gone up is expensive and slow.

What the timelines depend on

  • The size and complexity of the property.
  • The number of visualizations and revisions.
  • How quickly approvals come from your side.
  • Whether the renovation runs in parallel under author supervision.

Frequently asked questions

How long does an apartment design project take?

A design project for a 60–100 m² apartment takes roughly 8–12 weeks. The exact timeline depends on the size, complexity and how quickly approvals happen.

How long does an architectural design for a house take?

An architectural design for a house takes from 1 month. The timeline depends on the floor area, number of storeys and the complexity of the architecture.

Can a project be done in two weeks?

A proper, complete project with drawings and specifications cannot realistically be done in two weeks. Very tight promises usually mean part of the work — the working drawings, for example — will simply be skipped.